Informations générales
Type de construction
Structure: |
Tunnel |
---|---|
Fonction / utilisation: |
Road tunnel |
Méthode de construction: |
Cut-and-cover method |
Situation de l'ouvrage
Lieu: |
Schwäbisch Gmünd, Ostalbkreis, Baden-Württemberg, Germany |
---|---|
Coordonnées: | 48° 48' 10.28" N 9° 48' 21.27" E |
Coordonnées: | 48° 47' 48.93" N 9° 46' 56.49" E |
Informations techniques
Dimensions
total length | 2 230 m | |
clear interior profile | 9.50 m x 4.50 m | |
roadway / carriageway width | 7.50 m |
Quantités
concrete volume | 164 015 m³ | |
reinforcing steel | 21 000 t | |
volume of extracted material | 363 500 m³ | |
shotcrete | 25 800 m² | |
volume of earthworks | 349 500 m³ |
Coût
cost of construction | Euro > 280 000 000 |
Intervenants
Owner
Client
Design
Design consultants
- Jean-Jacques Zimmermann (design consultant)
Structural engineering
Soil investigation report
Checking engineering
- Dieter Kirschke (checking engineer)
- Matthias Gerold (checking engineer)
- Jörg Münzner (checking engineer)
Co-contractor
- Baresel AG
- Ed. Züblin AG
- G. Hinteregger & Söhne Baugesellschaft m.b.H.
- ÖSTU-STETTIN Hoch- und Tiefbau GmbH
Site supervision
Technical equipment engineering
Sites Internet pertinents
Aucun lien pertinent n'a été répertorié pour l'instant.
Publications pertinentes
- Brücken und Tunnel der Bundesfernstraßen 2014. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Allemagne), 2014, pp. 129-145.
- Informations
sur cette fiche - Structure-ID
20066265 - Publié(e) le:
25.06.2014 - Modifié(e) le:
28.05.2021