Generation of Construction Scheduling through Machine Learning and BIM: A Blueprint

Auteur(s):
ORCID

Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 4, v. 14
Page(s): 934
DOI: 10.3390/buildings14040934
Abstrait:

Recent advancements in machine learning (ML) applications have set the stage for the development of autonomous construction project scheduling systems. This study presents a blueprint to demonstrate how construction project schedules can be generated automatically by employing machine learning (ML) and building information modeling (BIM). The proposed solution should utilize building information modeling (BIM) international foundation class (IFC) 3D files of previous projects to train the ML model. The training schedules (the dependent variable) are intended to be prepared by an experienced scheduler, and the 3D BIM files should be used as the source of the scheduled activities. Using the ML model can enhance the generalization of model application to different construction projects. Furthermore, the cost and required resources for each activity could be generated. Accordingly, unlike other solutions, the proposed solution could sequence activities based on an ML model instead of manually developed constraint matrices. The proposed solution is intended to generate the duration, cost, and required resources for each activity.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10773516
  • Publié(e) le:
    29.04.2024
  • Modifié(e) le:
    05.06.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine